Satellite images show the construction of Saudi Arabia’s desert megacity, Neom, with the “Hidden Marina” being developed as the first residential phase.
The Hidden Marina is part of the Line, a 110-mile-long “vertical city” complex, which is set to be a centerpiece of Neom, with a planned cost of $140 billion and a scheduled opening by 2030.